back to Summit Connection main page
View from Alston Avenue of one lot. Driveway leading toward Alston Avenue.
View of the interior of one of the lots. View of the interior of one of the lots.
Aerial View of 7 Parcel Configuration
Aerial View of 5 Parcel Configuration
Click for Preliminary 7 Parcel Site Plan
|
Plans 7 parcel configuration includes 27 townhome units with office space on the first floor and residential space on the second and third floors. This project is excellent for a builder which seeks to tap into the growing market of people who have their own home businesses, since each unit can be an office and a home. Site plan is all set for you to submit to the Planning Department for rezoning approval. However, you can revise the site plan to meet your needs. The 5 parcel configuration could yield up to 21 townhomes. Location! Location! Location! | |
|
Driving Distances: 5 minutes: NCC, 40, 147, 70, 10 minutes: Duke, Downtown Community: Lowes Grove For map click here.
Lot ID, Address, and Acres 157013, 3421 Alston Ave., 1.1 157012, 3421 Alston Ave., 0.1 157007, 1816 Catalina St., 0.6 157018, 3614 C View St., 0.27 157019, 3612 C View St., 0.27 157001, 3452 C View St., 0.36* 157021, 3604 C View St., 0.51* *The 5 parcel configuration would not have these last two lots.
Zoning Some lots are zoned CM and IL. Most are R-20. The Planning Department says it is possible to rezone the assemblage for a mixed use development.
|
Surface: There are 4 houses. Mixed of wooded and cleared land. Mostly flat, slope in some areas. Road Frontage: Alston Ave., Catalina St., and C View St., all of which are paved. Traffic Count: 3600 on Alston Ave. Units: 16 ft x 40 ft, 1920 square feet. There will be office space on the first floor and residential space on the 2nd and 3rd floors. Estimate of Revenue from Sale of 27 Units: $4,320,000 Estimate of Revenue from each unit: $160,000 Estimate Major Development and Construction Expenses Impact Fee: $62,000. If the office space is replaced by residence space, then the impact fee would be $17,000 Street Paving and Curb: $53,000 Street Lights: $12,000 Other Lights: $14,000 Sewer: $40,000 Water: $32,000 Sewer and Water Tap Fee $85,000 Landscape Buffer Planting: $33,000 Foundation Planting: $26,000 Boundary Buffer Wall: $24,000 Walkway: $10,000 Irrigation: $14,000 Drainage: $15,000 Demolition $40,000 Tree Replacement: $ 7,000 Government Approvals: $10,000 Construction, $110,000 x 27 units $2,970,000 Sales (No Realtor): $15,000 Total: $3,465 Estimated Profit: $855,000
|
Schools:Elementary School: Bethesda |
Brokers: 3% Commission to buyer's broker |
Contact:Summit Connection, LLC
(703) 404-8429, bruce@mcbarnette.com 248 Willow Terrace Sterling, VA 20164
| |